Before. There is a trench around the wooden post, which is a problem because the water accumulates and causes the post to rot. It also holds the water during the winter and freezes which causes the cement to break.
So I added cement to fill the trenches and build it up to create a slope so that the water (summer and winter) can drain away from the wooden posts preventing rot and the cement breaking from freezing water in the winter.
Saturday, July 28, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment