Before. There is a trench around the wooden post, which is a problem because the water accumulates and causes the post to rot. It also holds the water during the winter and freezes which causes the cement to break.
So I added cement to fill the trenches and build it up to create a slope so that the water (summer and winter) can drain away from the wooden posts preventing rot and the cement breaking from freezing water in the winter.
No comments:
Post a Comment