This time the quarter round is installed along with the metal strip at the passage way and the basement door threshold.
The pine plank at the door threshold between washroom and living room has been stained. I am leaving the painter's tape until the varathane has been applied.
The melamine shelf has been built and installed in the washroom/laundry room.