The first half of the mudroom has been primed and painted, including the floor. The refrigerator is back in place. The light switch, outlet have been replaced.
The second half of the mudroom, has been primed. The cement floor has been scrubbed clean. And the closet has been bleached.
No comments:
Post a Comment