The plants have been removed. The topsoil dug up and set aside. Ready to fill the hole with limestone and pack it. Then install the patio slabs for support, onto which the wooden steps will be set on.
The limestone filled in the hole and packed. The patio slabs are recessed in the limestone, so that they are not seen. With the steps setting on top of the patio slabs. In front of the steps are flagstone slabs.
The side steps will be setup the same as the front steps.
The start of the limestone.
More pictures to come.
No comments:
Post a Comment