Wednesday, July 11, 2007

miscellaneous

Bedroom #2, pine plank floor has 2nd coat of urethane cured. Sorry for the paper on floor, but needed for painting the doors.


Both electrical outlets in dining room replaced.




The light switch, the outlet and light fixture replaced in bedroom #2 on w.w.







The 2 doors in bedroom #2 w.w. have been cut at the bottom, reinstalled and primed.





The capping planks for the brick wall at the wood stove area have been primed with oil base.


No comments: