Tuesday, July 17, 2007
master bedroom, ceiling (in progress)
Fixing water damaged ceiling in master bedroom. Needed to cut out the thinned out gyproc and then started to gradually build up a ring layer of Sheetrock plaster.
Kept building up the ring layer until a solid patch achieved.
More to come.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2007
(103)
►
09/02 - 09/09
(13)
►
08/26 - 09/02
(4)
►
08/19 - 08/26
(3)
►
08/12 - 08/19
(2)
►
08/05 - 08/12
(2)
►
07/29 - 08/05
(7)
►
07/22 - 07/29
(8)
▼
07/15 - 07/22
(9)
dining room, moved the cabinet
master bedroom, ceiling fix
living room, threshold primed (in progress)
master bedroom, ceiling (in progress)
mainfloor washroom, patching (in progress)
living room exterior entrance, threshold (in progr...
master bedroom, fixed (completed) floor
hallway e.w., quarter round
mudroom (in progress), painting
►
07/08 - 07/15
(15)
►
07/01 - 07/08
(2)
►
06/24 - 07/01
(3)
►
06/17 - 06/24
(3)
►
06/10 - 06/17
(8)
►
06/03 - 06/10
(4)
►
05/27 - 06/03
(2)
►
05/20 - 05/27
(4)
►
05/06 - 05/13
(1)
►
04/29 - 05/06
(1)
►
04/22 - 04/29
(1)
►
04/08 - 04/15
(1)
►
04/01 - 04/08
(4)
►
03/25 - 04/01
(2)
►
03/18 - 03/25
(4)
No comments:
Post a Comment