Friday, July 6, 2007

bedroom #2 west wing, panels/trim painted (take 5)

The wall panels and trim covering the gaps have been painted. The trim covering gaps between the wall panels and the ceiling have been painted white along with the attic access, door trim, window trim and the baseboards. Next is the pine floor.




Tuesday, July 3, 2007

bedroom #2 west wing, trim & prime (take 4)

The trim pieces installed, covering the gaps between the panels. A coat of primer has been applied on the panels and trim pieces.




The attic access in bedroom #2 primed.

The attic access in hallway primed.

Saturday, June 30, 2007

Thursday, June 28, 2007

bedroom #2 west wing, panels (take 2)

A few more panels installed. It takes time to measure and cut precisely for a good fit around the window frame.


Wednesday, June 27, 2007

bedroom #2 west wing, panels (take 1)

When attempted to remove the wallpaper I found multiple layers and 1 coat of paint. The removal was quite messy and painting was out of the question. Therefore, I am applying white wall panels that can be painted.




Wednesday, June 20, 2007

bedroom #2 on west wing new flooring

The new pine plank flooring installed.


Threshold at entrance.

Threshold at closet.

Tuesday, June 19, 2007

bedroom #2 on West wing

Before picture of floor without old rug, which I already removed.


After having installed the new underlay for flooring.

Closet threshold.

Entrance threshold.


Started to remove the wallpaper but realized that too much work is involved being that there are so many layers.
1st top layer is wallpaper (flowery strips)
2nd layer is wallpaper (larger flowers with green leaves)
3rd layer is paint (pink)
4th layer is wallpaper (grayish with fern leaves)
5th last layer is fuzzy wallboard (brown paper)
Time to rethink the wall treatment.